Hydrocarbons occupy a vital role in our life and continue to play an important role for many more years to come. We need to follow all technological innovations to continue our productivity standards to achieve our production targets. Let us extend our vision to achieve this mission.

Friday, December 30, 2011

Formation Integrity Test (FIT) Procedure and Calcualtion

Formation Integrity Test is the method to test strength of formation and shoe by increasing Bottom Hole Pressure (BHP) to designed pressure. FIT is normally conducted to ensure that formation below show will not be broken while drilling the next section with higher BHP. Normally, engineers in town will design how much formation integrity test pressure required mostly in ppg.

Before forming formation integrity test, you should know pressure required for Formation Integrity Test. The formula showed below demonstrates you how to calculate required FIT pressure.

Pressure required for FIT (psi) = (Required FIT in ppg – Current Mud Weight in ppg) x 0.052 x True Vertical Depth of shoe in ft

Example:
Required FIT (ppg) = 14.5
Current mud weight (ppg) = 9.2
Shoe depth TVD (ft) = 4000 TVD
Pressure required for FIT = (14.5-9.2) x 0.052 x 4000 = 1102 psi

Formation Integrity Test (FIT) guideline is listed below: (note: this is just only guide line. You may need to follow your standard procedure in order to perform formation integrity test):

1. Drill out new formation few feet, circulate bottom up and collect sample to confirm that new formation is drilled to and then pull string into the casing.

2. Close annular preventer or pipe rams, line up a pump, normally a cement pump, and circulate through an open choke line to ensure that surface line is fully filled with drilling fluid.

3.Stop the pump and close a choke valve.

4. Gradually pump small amount of drilling fluid into well with constant pump stroke. Record total pump strokes, drill pipe pressure and casing pressure. Pump until casing pressure reaches the pressure required for formatin integrity test. Hold pressure for few minutes to confirm pressure.

5. Bleed off pressure and open up the well. Then proceed drilling operation.

Please find the Excel sheet to calculate pressure required for formation integrity test.