Hydrocarbons occupy a vital role in our life and continue to play an important role for many more years to come. We need to follow all technological innovations to continue our productivity standards to achieve our production targets. Let us extend our vision to achieve this mission.

Thursday, December 22, 2011

Dilution of Mud System to Control Low Gravity Solid

By adding bbl of base fluid required, dilution of mud can help control Low Gravity Solid (LGS) in mud system. This post will demonstrate you how to determine barrels of dilution fluid such as water or base fluid required to achive the desired low gravity solid.

Formula used to calculate dilution of mud system is listed below;

Vwm = Vm x (Fct – Fcop) ÷ (Fcop)

Where; Vwm = barrels of dilution water or base fluid needed

Vm = total barrels of mud in circulating system

Fct = percent low gravity solids in system

Fcop = percent total low gravity solids desired

Example: Determin how much barrels of base oil to diluate total 2000 bbl of mud in system from total LGS = 7 % to desired LGS of 3.5 %.

Vm = 200 bbl

Fct = 7%

Fcop = 3.5%

Vwm = 2000 x (7 – 3.5) ÷ 3.5

Vwm = 2000 bbl

In order to dilute total of 2000 bbl of the original mud with 7% LGS down to 3.5% LGS, 2000 bbl of base oil is requied to add into the system.

Please find the excel sheet used to calculate how much barrel of base fluid to control Low Gravity Solid (LGS) in mud system.

1 comment:

  1. Is it desirable to have a screen-less solids control system to keep from breaking the drill solids up into LGS?

    ReplyDelete

Thanks for visiting the site and your interest in oil and gas drilling

free counters