Hydrocarbons occupy a vital role in our life and continue to play an important role for many more years to come. We need to follow all technological innovations to continue our productivity standards to achieve our production targets. Let us extend our vision to achieve this mission.

Tuesday, November 9, 2010

Strategies for Capital Project Management in Upstream Oil and Gas




HART WEBINARS
What: Webinar When: November 16, 2010 Time: 2:00 pm CST Cost: FREE
Strategies for Capital Project Management in Upstream Oil and Gas


register


Managers from engineering, procurement and construction companies, owner-operators and others should tune into this web-based broadcast to learn about:

Current examples and projections for major oil and gas capital projects
A business value assessment methodology applied to capital projects
Capabilities of today's 3D engineering systems and centralized data depositories to support effective collaboration

Overview:

Collaboration and information sharing for projects undergoing constant change and revision; addressing complexity challenges in the globalization era

In the oil and gas industry, capital projects frequently exceed both schedule and budget by more than 10 percent, according to a recent Booz Allen Hamilton survey. Moreover, as many productive oil and gas fields near depletion, new sources are being sought in ever-more-remote deepwater reserves, exacerbating the complexity of the project manager's task.

Capital Project Management federates all aspects of a project in one single system, facilitating enterprise-wide collaboration and improving global project ecosystem productivity — from design, planning and construction, through operations and decommissioning.

REGISTER NOW

Sponsored by:

autodesk logo

e&p logo


About the speaker:

KlementDr. Uri Klement, Senior Industry Consultant for Energy, Dassault Systemes Americas

Klement was a senior technology associate at Imperial Chemical Industries of Great Britain when he first developed a 3D plant design system.

Klement co-founded EA Systems, a provider of 3D process plant engineering and document management solutions.
As CEO of Baan Engineering Klement focused on seminal ERP vendor Baan Co.'s product-data management solutions. Klement subsequently was president of SmarTeam Americas – a Dassault Systemes company.
Klement has a US patent for capture and management of 3D As Built Plant Data using Photogrammetry.

Klement has a 1st Class Honors BS in Aeronautical Engineering and a PhD in Fluid Mechanics from the University of Manchester in Gt. Britain MORE>>

 

Copyright 2010 Hart Energy Publishing
Hart Energy Publishing • 1616 S. Voss, Suite 1000 • Houston, Texas USA, 77057-2627
Tel: +1 (713) 993-9320; Fax: +1 (713) 840-8585

Informz

No comments:

Post a Comment

Thanks for visiting the site and your interest in oil and gas drilling

free counters